Operate arc · Acquire to Retire

MASON

Maintenance, Availability, Scheduling & Order Navigator

To turn a maintenance need into safe, fully prepared and correctly prioritised work.

Employee IDPXN-A2R-001

MASON

Maintenance, Availability, Scheduling & Order Navigator

Position
Maintenance Planning
Value chain
Acquire to Retire
Reports to
Head of Asset Management
Measured on
Schedule-ready rate and schedule compliance
Authorised · Logged · ReversibleRuns in ERP and Supply chain

Would you know today which of tomorrow's jobs is missing a part?

The question MASON is hired to answer. The chart shows who holds the position and where the decision goes when it is not MASON's to make.

Work chart

  1. AccountableHead of Asset Management
  2. Position held byMASON
  3. Escalates toHSE · Maintenance manager · Production planning · Stores

With MASON in the roleThis job is genuinely ready, parts, crew, access and permit confirmed, or it is not on the schedule.

MASON triages notifications, verifies parts, crews, access and windows, reserves approved material, assigns readiness, tracks completion. The schedule and job priority, with constraints resolved and exceptions named.

The number MASON is measured on

Every digital coworker is hired against one primary measure, agreed and baselined before build. The others are read alongside it so the primary cannot be moved at their expense.

Primary measure

Schedule-ready rate and schedule compliance

  • First-time-fix rate
  • Ratio of planned to reactive work
  • Delays attributable to a missing part, skill, access or permit
  1. 01

    Fewer jobs failing on the day, because readiness is verified rather than assumed

  2. 02

    The planned-to-reactive ratio moving in the planned direction, which is the lever that moves the maintenance cost ratio

  3. 03

    First-time fix improved through preparation, not through additional visits

  4. 04

    Backlog shaped by criticality, not by who shouted

  5. 05

    Every deferral attributable, with its rationale and approver recorded

What MASON does alone, and what stays with your team

MASON reports to the Head of Asset Management. Anything outside the written boundary goes to HSE, maintenance manager, production planning or stores, with the evidence attached.

“Authorised. Logged. Reversible.”

Authority, and yoursPXN-A2R-001
Does this aloneTriages notifications · verifies parts, crews, access and windows · reserves approved material · assigns readiness · tracks completion
RecommendsThe schedule and job priority, with constraints resolved and exceptions named
EscalatesSafety-critical, statutory and production-loss decisions → named authorities · Work affecting a production commitment → planning, jointly · Any notification indicating a safety-critical defect → HSE and the maintenance manager immediately, outside the normal queue
Head of Asset Management
ProxyN outcome lead

MASON's skills, and the workday

MASON enriches the work order, classifies notifications, proposes job plan and priority, checks parts, crews, access and windows, reserves approved material, raises requisitions for missing parts, requests inspection or permit, flags prerequisite gaps, assembles the weekly schedule, notifies responsible owners, updates readiness and evidence, tracks completion.

  • Triages notifications by criticality and failure mode
  • Detects duplicate and repeat work
  • Verifies parts, tools and material readiness
  • Matches crew skill, certification and contractor availability
  • Detects production window and shutdown conflicts
  • Identifies permit and isolation requirements before scheduling
  1. Reads from ERP and Supply chain

  2. Enriches the work order

  3. Classifies notifications

  4. Proposes job plan and priority

  5. Checks parts, crews, access and windows

  6. Reserves approved material

  7. Raises requisitions for missing parts

  8. Requests inspection or permit

  9. Flags prerequisite gaps

  10. Assembles the weekly schedule

  11. Notifies responsible owners

  12. Updates readiness and evidence

  13. Tracks completion

  14. Your team decides

Get started

Stop Buying Platforms. Start Hiring Outcomes.

Bring one workflow and the person accountable for it. In the first session we map the process, establish the baseline logic and tell you whether there is a number worth signing. If there is not, we will say so.