MASON
Maintenance, Availability, Scheduling & Order Navigator
- Position
- Maintenance Planning
- Value chain
- Acquire to Retire
- Reports to
- Head of Asset Management
- Measured on
- Schedule-ready rate and schedule compliance
Operate arc · Acquire to Retire
Maintenance, Availability, Scheduling & Order Navigator
To turn a maintenance need into safe, fully prepared and correctly prioritised work.
MASON
Maintenance, Availability, Scheduling & Order Navigator
The question MASON is hired to answer. The chart shows who holds the position and where the decision goes when it is not MASON's to make.
Work chart
With MASON in the roleThis job is genuinely ready, parts, crew, access and permit confirmed, or it is not on the schedule.
MASON triages notifications, verifies parts, crews, access and windows, reserves approved material, assigns readiness, tracks completion. The schedule and job priority, with constraints resolved and exceptions named.
Every digital coworker is hired against one primary measure, agreed and baselined before build. The others are read alongside it so the primary cannot be moved at their expense.
Primary measure
Schedule-ready rate and schedule compliance
Fewer jobs failing on the day, because readiness is verified rather than assumed
The planned-to-reactive ratio moving in the planned direction, which is the lever that moves the maintenance cost ratio
First-time fix improved through preparation, not through additional visits
Backlog shaped by criticality, not by who shouted
Every deferral attributable, with its rationale and approver recorded
MASON enriches the work order, classifies notifications, proposes job plan and priority, checks parts, crews, access and windows, reserves approved material, raises requisitions for missing parts, requests inspection or permit, flags prerequisite gaps, assembles the weekly schedule, notifies responsible owners, updates readiness and evidence, tracks completion.
Reads from ERP and Supply chain
Enriches the work order
Classifies notifications
Proposes job plan and priority
Checks parts, crews, access and windows
Reserves approved material
Raises requisitions for missing parts
Requests inspection or permit
Flags prerequisite gaps
Assembles the weekly schedule
Notifies responsible owners
Updates readiness and evidence
Tracks completion
Your team decides
Each role understands the work either side of it. See how Acquire to Retire runs end to end.
Get started
Bring one workflow and the person accountable for it. In the first session we map the process, establish the baseline logic and tell you whether there is a number worth signing. If there is not, we will say so.